Letter to the Editor; Sunday Times; 19.7.2020
Incinerators lay pollution waste
With regard to your report “Meath incinerator seeks to double hazardous waste capacity” (News, July 5) the identity of the “hazardous waste” is not fully known.
Furthermore,
the system in place for monitoring gas emissions and other by-products
(heavy metals?) raises doubts as to whether it can properly monitor
pollutants in real time, and make the data publicly available on a
continuous basis. Cross-contamination of water and the food chain cannot
be excluded, given the limited data. Without this information in place,
how can the Environmental Protection Agency grant an operational
permit? Furthermore, the “Trojan horse” process by which polluters can
apply for incineration licences and return later to apply for
significant increases in gross tonnages, and the right to burn new types
of hazardous waste, effectively allows them to evade scrutiny.
CRH
in Platin was originally granted a licence to incinerate 120,000 tons
of waste. Their latest application would increase this to 600,000, with
significant increases in the proportion of hazardous materials.
Claire Keating, Derek O’Dwyer, Ioannis Zabetakis, Limerick
= = = =
here is the full letter as sent to ST.
Letter to the Editor - Sunday Times
Limerick, 14th July
2020
Dear Sir,
With regard to the report of Colin
Coyle “Meath incinerator seeks to double hazardous waste capacity” Sunday Times
5.7.2020, we would like to highlight the following points:
1.
The identity of “hazardous waste” is not fully known at the time of
application for permit.
2.
The monitoring system of gas emissions and other by-products (heavy
metals?) that is in place raises some doubts around its efficacy to properly monitor
pollutants in real time and make these data publicly available on a continuous
basis.
3.
Possible cross-contamination of water (inland or sea) and the food chain
can not be excluded given the limited data known at the time of application.
Without this information in place, how can EPA grant operational permit?
4.
Lastly, there is clear conflict in how incineration (and any other
possibly polluting) processes are monitored across EU. In all member states,
the authority with responsibility for granting the operational permit (license)
is the same authority that monitors the legal operation of the facility. In Ireland’s case, it’s the EPA. This effectively
prevents the EPA from effectively applying “the polluter pays” principle which
dictates that the polluter has to pay the full amount to compensate total
environmental damage (in case, for example, of a possible leak of heavy
metals).
5.
Furthermore, the “Trojan Horse” process by which polluters can apply for
incineration licenses and return later to apply for significant increases in
gross tonnages and rights to burn new types of hazardous waste allows polluters
to evade scrutiny and mask legitimate public concerns on their longer-term
intentions. For example, CRH in Platin were originally granted a license to
incinerate 120,000 tonnes of waste. Their latest application would increase
this to 600,000 tonnes per annum with significant increases in the proportion
of hazardous materials.
Sincerely,
Claire Keating,
Derek O’Dwyer
Limerick Against
Pollution, Limerick
and Ioannis
Zabetakis, Lecturer, Univ. of Limerick
P.S. Hong Kong incineration plans blasted by Prof Paul Connett - who advocates Zero Waste

